MEMBER SIGN IN
Not a member? Become one today!
         iBerkshires     Berkshire Chamber     Berkshire Community College     City of Pittsfield    
Search
Daytime Paving Scheduled on Sections of Route 8
04:00PM / Monday, October 17, 2022
Print | Email  

PITTSFIELD, Mass. — The Massachusetts Department of Transportation (MassDOT) will be conducting daytime paving operations on sections of Route 8 from the Deerfield Street intersection in Pittsfield and then north to the town line for Lanesborough and Cheshire.
 
The work will take place daily from Tuesday, Oct. 18, through Friday, Oct. 21, during daytime hours from 6:00 a.m. to 5:30 p.m.
 
Standard MassDOT construction work zone logistics and police details will be used for traffic control.  Two lanes of travel will be maintained at all times. 
 
Drivers who are traveling through this area should expect delays, reduce speed, and use caution. 
 
All scheduled work is weather dependent and/or may be impacted due to an emergency. 
 
For information on traffic conditions travelers are encouraged to:? 
  • Dial 511 before heading out onto the roadways and select a route to hear real-time conditions.  
  • Visit www.mass511.com, a website which provides real-time traffic and incident advisory information, access to traffic cameras, and allows users to subscribe to text and email alerts for traffic conditions.  
  • Follow MassDOT on Twitter @MassDOT to receive regular updates on road and traffic conditions. 
  • Download MassDOT's GoTime mobile app and view real-time traffic conditions before setting out on the road.
Comments
More Featured Stories
Pittsfield.com is owned and operated by: Boxcar Media 106 Main Sreet, P.O. Box 1787 North Adams, MA 01247 -- T. 413-663-3384
© 2008 Boxcar Media LLC - All rights reserved