CONSTRUCTION UPDATE
September 22 - 26, 2014

Construction update September 22 - 26, 2014 in downtown Pittsfield on North Street between Madison and Tyler Streets; and on the pedestrian plazas at the corners of Columbus and Eagle Streets at North Street.

PLEASE NOTE: All businesses will be open and accessible.

STREETSCAPE PHASE 3
North Street – between Madison Avenue and Tyler Street 

  • The contractor will continue work in front of Berkshire Medical Center and the island in the roadway between Burbank and Tyler Street.
  • Sidewalk work will continue on the west side.
  • Gateway base excavation and installation just past Wahconah Street intersection will begin midweek.
  • Vehicular traffic will be one lane in each direction.
  • Please be mindful of construction warnings, signage and barriers.






PERSIP AND SOTTILE - 
PEDESTRIAN PLAZA AREAS

Parks at the corner of Columbus Avenue and North Street and Eagle Street and North Street

  • Work will continue inside the fenced area at Persip Park.
  • The contractor will be installing pavers and concrete sidewalks.
  • There should be no disruptions to pedestrian or vehicular traffic.
  • Pedestrians should remain out of the fenced construction area.