Downtown Pittsfield Construction Update, Sept. 22-26, 2014Downtown Inc., 12:48PM / Monday, September 22, 2014 | |
CONSTRUCTION UPDATE
September 22 - 26, 2014
Construction update September 22 - 26, 2014 in downtown Pittsfield on North Street between Madison and Tyler Streets; and on the pedestrian plazas at the corners of Columbus and Eagle Streets at North Street.
PLEASE NOTE: All businesses will be open and accessible.
STREETSCAPE PHASE 3
North Street – between Madison Avenue and Tyler Street
-
The contractor will continue work in front of Berkshire Medical Center and the island in the roadway between Burbank and Tyler Street.
-
Sidewalk work will continue on the west side.
-
Gateway base excavation and installation just past Wahconah Street intersection will begin midweek.
-
Vehicular traffic will be one lane in each direction.
-
Please be mindful of construction warnings, signage and barriers.
|
|
PERSIP AND SOTTILE - PEDESTRIAN PLAZA AREAS
Parks at the corner of Columbus Avenue and North Street and Eagle Street and North Street
-
Work will continue inside the fenced area at Persip Park.
-
The contractor will be installing pavers and concrete sidewalks.
-
There should be no disruptions to pedestrian or vehicular traffic.
-
Pedestrians should remain out of the fenced construction area.
|